PROJECT DESCRIPTION

Package 1: FRP works to Sydney Metro Trains Facility – South
Package 2: FRP works to Southern Dive Portal Structure

Abyss Construction completed:

  • FRP works to all Buildings for the Trains facility which comprised of: Administration Building, Water Treatment Plant, Warehouse, Workshop, Depot Security & Fire Pump Buildings, including the supply, installation & core filling of blockwork
  • FRP works to the Southern Dive portal structure
  • FRP works to the Water Retaining Structures in relation to the Water Treatment Plant (Clarifier Tank 6.0m high, 12m diameter)
  • All External works inclusive of footpaths, kerb & gutter, concrete pavements & in ground in-situ & precast pits (HV & Stormwater)
  • FRP works for all track slabs & track side equipment footings
  • Installation of precast train platforms

Request a Quote

Name(Required)

Project information

Head Contractor:

Systems Connect Line Wide Works (CPB UGL JV)

Date:

May 2021 – Dec 2022

Project value:

$20.5B

Package value:

$11.5M total

Location:

The site is located north of Sydenham Station and south of Bedwin Road, bordered by Edinburgh and Sydney Steel roads, Murray Street and the rail corridor.  2A Sydney Steel Road, Marrickville

Key People For This Project:

Management:
Pa O’Sullivan, Neil Rahill, Lloyd LeCornu

Supervision:
David O’Brien, Aidan O’Sullivan, John Gormley, Patrick Duffy

Key Suppliers & Subcontractors:
RMD, Acrow, All Lift, Danterr, Reillys Masonry, Wallace Concrete Pumping, Go Pro Civil, Sam the Paving Man, AWP

Consultants:
Riddwood Consulting Engineers (Temporary works)

Sector