PROJECTS

Surface and Civil Alignment Work Project (SCAW)

Bridge - Surface and Civil Alignment Works

PROJECT DESCRIPTION

Abyss Construction are currently completing the following works:

M12 bridge (seven spans):

  • All works associated with Formwork, Reinforcement fixing and pouring of concrete for structures:
    • Abutments and wing walls
    • Headstocks
    • Bridge decks
  • Placement and installation of precast concrete elements, including super T girders and parapet barrier units
  • Installation of expansion joints, cover plates
  • Installation of drainage

Viaducts (88 piers):

  • All works associated with Formwork, Reinforcement fixing and pouring of viaduct substructure:
    • Pile caps
    • Pier columns
    • Capital

Western Sydney Airport Retaining Wall

All works associated with Formwork, Reinforcement fixing and pouring of the retaining wall structure, including the base, walls and capping beam

Request a Quote

Name(Required)

Project information

Head Contractor:

CPBUIJV – CPB Contractors and United Infrastructure Joint Venture.

Date:

February 2023

Project value:

$538.5 Million

Package value:

$12 Million

Location:

Sydney, NSW

Key People For This Project:

Superintendent – Pa O’Sullivan
Supervisor (SCAW Bridges) – Brian Gammell (Sonny)
Supervisor (Viaducts) – James Clerkin
Senior Project Engineer (Viaducts) – Chris Cofre
Project Engineer (SCAW Bridges) – Patricia Kesuma
Site Engineer (SCAW Bridges) – Gary McElroy

Sector