PROJECT : Port Upgrads
CLIENT : Pilbarra Ports
CONTRACTOR : Tams Group
SECTOR : Infrastructure – Marine
LOCATION : Port Hedland
PROJECT VALUE : $26 m
PACKAGES VALUE : $5350,000
Project Descriptions
Berth 3 Upgrade which included demolition and replacement of the wharf deck and other associated works. The existing 182m x 32m x 300mm thick concrete slab was cut into sections with a road saw and lifted out using a 400T crane.
The steel wharf substructure was blasted and painted. The existing crane rail beams were removed and new be ams landed in position and spliced. Permadeck formwork and steel reinforcing including an upper layer of stainless steel reinforcing was placed and fixed. Concrete was then poured in 300m3 sections with a total of 2000m3 of concrete used for the project.
Our Scope of Works
- Install formwork
- Install reinforcement
- Install concrete
- Provision of labour