Port Extension and Upgrade

OUR PROJECTS

Burill Lake Bridge

Canberra Light Rail

St. Peters Substations SPI

Track Slabs

East Mirroll Escape

Farm outlets

Port Extension and Upgrade

Platform Extension Works

Olympic Stair Construction

Northern Road Culverts

Capacity Increase Works

Water Tratment Tanks

Sydney Opera House

Platform Releveling

CONTACT US

Call us on

Tim – 0447 355 709
Pa – 0448 208 640
Cathal – 0404 564 369

 

PROJECT :  Port Upgrads

CLIENT : Pilbarra Ports

CONTRACTOR :  Tams Group

SECTOR : Infrastructure – Marine

LOCATION : Port Hedland

PROJECT VALUE : $26 m

PACKAGES VALUE : $5350,000

Project Descriptions

Berth 3 Upgrade which included demolition and replacement of the wharf deck and other associated works. The existing 182m x 32m x 300mm thick concrete slab was cut into sections with a road saw and lifted out using a 400T crane.

The steel wharf substructure was blasted and painted. The existing crane rail beams were removed and new be ams landed in position and spliced. Permadeck formwork and steel reinforcing including an upper layer of stainless steel reinforcing was placed and fixed. Concrete was then poured in 300m3 sections with a total of 2000m3 of concrete used for the project.

Our Scope of Works

  • Install formwork
  • Install reinforcement
  • Install concrete
  • Provision of labour

Projects Gallery

Related Projects

HOME

DEMO CONTENT

NEWS/MEDIA

LATEST PROJECT

WATER

BRIDGES

ENERGY

UNDERGROUND

REMEDIATION

TRANSPORT