East Mirroll Escape
OUR PROJECTS
Burill Lake Bridge
Canberra Light Rail
St. Peters Substations SPI
Track Slabs
East Mirroll Escape
Farm outlets
Port Extension and Upgrade
Platform Extension Works
Olympic Stair Construction
Northern Road Culverts
Capacity Increase Works
Water Tratment Tanks
Sydney Opera House
Platform Releveling
CONTACT US
Call us on
Tim – 0447 355 709
Pa – 0448 208 640
Cathal – 0404 564 369

CLIENT : Murrinbidgee Irragation
CONTRACTOR : Miara
SECTOR : Infrastructure – Water
LOCATION : Griffith NSW
PROJECT VALUE : $300 million
PACKAGE VALUE : $ 1.2 million
Project Description
The first two major projects to be completed by the Alliance include the Hanwood Modernisation Project and Lake Wyangan Modernisation Project, which includes the upgrades to existing lined sections of the Lake View Branch Canal (LVBC), gravity piping of southern area laterals, channel automation and replacement of Dethridge meter outlets.
Our Scope Included :
- Installation of high-volume metered escapes and control structures.
- Bulk and detailed excavations including embankment shaping & rock beaching
- Supply & Install formwork, steel reinforcement, cast ins and concrete
- Install all access and solar powered mechanical structures