CLIENT : Murrinbidgee Irragation

CONTRACTOR : Miara

SECTOR : Infrastructure – Water

LOCATION : Griffith NSW

PROJECT VALUE : $300 million

PACKAGE VALUE : $ 1.2 million

Project Description

The first two major projects to be completed by the Alliance include the Hanwood Modernisation Project and Lake Wyangan Modernisation Project, which includes the upgrades to existing lined sections of the Lake View Branch Canal (LVBC), gravity piping of southern area laterals, channel automation and replacement of Dethridge meter outlets.

Our Scope Included :

  • Installation of high-volume metered escapes and control structures.
  • Bulk and detailed excavations including embankment shaping & rock beaching
  • Supply & Install formwork, steel reinforcement, cast ins and concrete
  • Install all access and solar powered mechanical structures