Client: Murrumbidgee Irrigation
Contractor: MIARA
Sector: Infrastructure – Water
Location: Griffith NSW
Project Value: $300 million
Package Value: $ 3.2 million
Project Description:
The first two major projects to be completed by the Alliance include the Hanwood Modernisation Project and Lake Wyangan Modernisation Project, which includes the upgrades to existing lined sections of the Lake View Branch Canal (LVBC), gravity piping of southern area laterals, channel automation and replacement of dethridge meter outlets.
Our Scope Included:
- Diversion and non-contamination underpass of canal and river
- Installation of high-volume metered escapes and control structures.
- Excavations
- Pipelaying
- Install formwork, steel reinforcement and concrete
- Install mechanical structures